Inside jumper put pieces of foam block (insulation) in the bottom - rebar, wire ties, not to pieces flew off foam blocks.


Inside the window bridge


removed the shuttering of window bridge

While the flooded and dry the second bridge, a row of flooded bridge is filled with blocks.


Ряд над перемычкой

Filled all bridge for a week, laid the top of the blocks.


ready!

To prepare for the winter, the top wall hid the roofing material and pressed bricks.

готов к зиме
Ready for winter

The next step, after the winter, will be assembling the walls of the attic and wooden floors, Want to see next?, click the link "forward"!