Build an attic ...

Building walls attic floor began assembling armored belt.

Building walls attic floor began to mount armored belt repeated stage assembly formworks, but at a height of 3 meters, had to suffer a little, but the work was done. Laid reinforced grid 4 mm thick.


Has delivered blocks, installation of armored belt


Formwork on the perimeter walls and the middle wall

Fill concrete was carried out with small amount of gravel (to smooth the top was, without leveling mortar).


armored belt ready


ready!

A week later withdrew the formwork, and began to prepare for laying the blocks. Under the project, we have included the console, they support the removal of the roof, their design and purpose will be more accessible and easier to show on the stage roof, but a little later.


Formwork unmounted

Want to see next?, click the link "forward"! ...