Fill monolithic slabs

back

For a qualitative grasp of the concrete have covered with polyethylene.


ready beam


ready beams

Between the beams reinforced with steel mesh filled "shelf"


Fill "shelf"

For a bunch of "shelves" in a whole chunks of the grid were exposed at the edges of shelves to fill the next flight together with the first. It is also not without mistakes, forget the edges floor set damping tape (concrete that expands from the heat), so in the future will need not to crush the walls.


'shelf'

After setting the shelves, after 3 days, dismantled from below "farm", set them to a new location, again hid the waterproofing and put a grid.


The grid is laid ...