Fill monolithic slabs

back


... overlap with the already flooded grid

Pouring concrete shelves, an important task, supervise and participate at the same time (wife shoots). Concrete and rams carefully smoothed.


Concrete placement


almost ready

On the second flight of the fill was laid on top film to grasp the better (at the first passage - lay not been able to not even come close to the corners).


Laid film

After filling all the living area, the question arose as to remove the formwork when the fill everything out of the situation began to pour in small pieces, and pull through as a small aperture.


Fill the last pieces