bath-pavilion, next step

back

By means of staples sheathed all exterior wall dressing room. Then took the sexes, and open the board, arranged in advance so that they can be easily removed. Since grass grows under the bath, it should be removed, I did not want to dig, so that made it easier, lay an old film and filled with sand on top.


Preparation of floors, walls lined with windscreen

To handle floorboards purchased vehicle from rotting, processed boards.


processed board

Bottom layer of insulation should be laid with waterproof flooring and is attached to the rails to the floor joists and framing trim.


Waterproofing of the floor


against

Insulation should be laid on top of the rolled insulation, 100 mm thick, the name did not survive that sort of Knauf.


Laying insulation 100 mm

Want to see next?, click the link "forward"! ...

Page: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

home | back | forward