bath-pavilion, next step

back


Laying insulation

A heater mounted on top of vapor barrier, leaving out laps to further their connection with the vapor barrier wall.


vapor barrier

To the board is not rubbed in the film, on-site installation board paved strip lenoleuma, they are already packed in a series board, and, slowly knocking down, and began assembling the floor.


laying planks

Board fastened to the rafters at 100 mm self-tapping, a little pre-expanding the hole to the head is not sticking out


mounting board