bath-pavilion, next step

back

After mounting plates mounted in direct vapor barrier, below its joining with the vapor barrier laps from the floor.


Installation of vapor barriers


on all walls

After the insulation of walls, ceiling insulation began, and since it we did not do as a class ..... (below the photo that was before ...)


What was before ...

Began with the crates, cementing her tightening the roof. Previously laid vapor barrier and attach it to a vapor barrier laps walls.


Crate Ceiling

Between puffs, from the attic, insulation is laid slab 100 mm stowed in the same pie Floor.


Ceiling Insulation

On top of ceiling insulation, put waterproofing.


waterproofing

Want to see next?, click the link "forward"! ...