2011, Heating system...

Install heating system

Installation of heating systems, has been selected to start piping diagram of the house, on the basis of a simple control the supply and lower the cost of the pipe, so the scheme was divided into 4 units:

Steel panel radiators are placed under each window, radiator just 11 pieces.

Radiators connected polypropylene pipe, use valves for each radiator

insulate pipes...

Central heating boiler was purchased KCHM-5...

... and boiler DRAZICE

Tying boiler tube top - supply pipe mounted on a security group, gauge, fittings for 4 circuits feeding socket for future inclusion on propane boiler, fitting on to the boiler output, down tube with a pump Wilo, drain valve...

After assembling the circuit and surge tank, pressurize the system broke gauge (was defective), added an additional automatic air after firing the boiler, even the draft regulator installed and configured on the control valve chain, it certainly does not work correctly, since the bottom of the boiler, there are many gaps and the air is sucked out, depending on its position, but it works properly...

And then the day came when it was set in place and tied with a boiler, wiring also led the plastic pipe with fiberglass pipes to bathrooms 1 and 2 floors, kitchen, decided to cut right in the boiler room for the convenience of wall decoration

Next, Well water